Energy Logo
Energy International Top Header
Home Overview Products and Services Markets Experience Media Contact Us
English Spanish

Colombia

BP Exploration

Equipment:


Location:
Electrical Output:
Application:
Installation:

1 x Taurus™ XQ5200 Gas Turbine from Solar Turbines @ 5,200 kWe
Cusiana, Colombia
4.2 MW
Petroleum field
October 2002

Metapetroleum

Equipment:

Location:
Electrical Output:
Application:
Installation:

4 x Cat® XQ1750 Power Modules @1,450 kWe
Rubiales, Meta, Colombia
6 MW
Water pumping
March 2009

Termo Rubiales

Equipment:



Location:
Electrical Output:
Application:
Installation:

Phase I - Block 1: 5 x Pielstick Engines 16PA6B
Phase II - Block 2: 4 x Pielstick Engines PC2-6V
Meta, Colombia
56.5 MW
Power generation plant
2009

Petrobras Colombia Limited

Equipment:

Location:
Electrical Output:
Application:
Installation:

3 x Taurus™ 60 from Solar Turbines @ 4.16kV each
Guando - Colombia
23 MW
Petroleum production
2004

Ecopetrol - Ocensa

Equipment:

Location:
Electrical Output:
Application:
Installation:

8 x Cat®3612 Diesel Engines 4,300 BHP @ 1,000 RPM ea
El Porvenir, Colombia
51,600 BHP
Crude oil Pumping
August, 1996

Ecopetrol - Ocensa

Equipment:


Location:
Electrical Output:
Application:
Installation:

12 x Cat®3612 Diesel Engines
4,300 BHP @ 1,000 RPM ea Miraflores, Colombia
34,400 BHP
Crude oil Pumping
August, 1998

Ecopetrol

Equipment:


Location:
Electrical Output:
Application:
Installation:

4 x Cat®G3608 Nat. Gas Engines 2,200 BHP @ 1,000 RPM ea
Provincia - Colombia
8,800 BHP
Gas compression
April 1998

Promigas

Equipment:


Location:
Electrical Output:
Application:
Installation:

4 x Cat®G3608, Nat. Gas Engines 2,200 BHP @ 1,000 RPM ea
Sahagun, Colombia
4,400 BHP
Gas compression
1998

Termovalle

Equipment:


Location:
Electrical Output:
Application:

Installation:

2 x Cat®3516, Diesel Engines 2,000 kWe @ 1,800 RPM ea
Cali, Colombia
3.5 MW ISOe
Electric Power Generation - Black Start
1998

Promigas

Equipment:

Location:
Electrical Output:
Application:
Installation:

1 x Taurus™ 60 Gas Generator Package from Solar Turbines / 7152 HP
Caracoli, Colombia
Gas Compression
2003

La Sierra

Equipment:
Location:
Electrical Output:
Application:
Installation:

2 x GE®MC7001 Gas Turbines
La Sierra, Antioquia, Colombia
150 MW
Combined Cycle
1998

Smurfit – Cartón de Colombia

Equipment:

Location:
Electrical Output:
Application:

Installation:

1 x Mars® 100 CHP / Gas Turbine from Solar Turbines
Sahagun - Bolivar, Colombia
1,800 KWe
Cogeneration / Electric power & Saturated Steam
1998

Hocol

Equipment:



Location:
Electrical Output:
Application:
Installation:

1 x Taurus™ 60 Gas Generator Package from Solar Turbines / 4.2 MW ea
3 x Centaur® 50 uprated to Taurus™ 60
San Francisco, Colombia
Electric Power Generation
1998

Drummond Pribbenow Coal Mine

Equipment:

Location:
Electrical Output:
Application:
Installation:

1 x Cat®XQ2000 @ 1,800 KWe
Cesar, Colombia
1.8 MW
Base load utility
March 2004

Related Links:

   Brazil

   Ecuador

   Guyana

   Peru

   Suriname

   Venezuela